I got a 9' pencil tree for the foyer and pre lit garland for the staircase.
Sunday, March 1, 2015
master bedroom and master bathroom painted, hall closet more organized
I got some baskets at Kohls. I still need to get one more.
downstairs bathroom is done
BEFORE:
AFTER:
I added lattice for the vertical pieces and chair rail molding and 3 1/2" flat wood for the horizontal pieces.
Subscribe to:
Posts (Atom)